About: Central Interceptor     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FCentral_Interceptor

The Central Interceptor is an upcoming Watercare Services infrastructure project to bore a giant wastewater pipe underneath the Auckland Central Isthmus, to carry wastewater flows from parts of the city to the Mangere Wastewater Treatment Plant. The new interceptor will be Auckland's largest wastewater project in history, costing approximately $1.2B, and being 13 km long (plus side branches), and 4.5m diameter. It is to run from Western Springs to Mangere.

AttributesValues
rdfs:label
  • Central Interceptor (en)
rdfs:comment
  • The Central Interceptor is an upcoming Watercare Services infrastructure project to bore a giant wastewater pipe underneath the Auckland Central Isthmus, to carry wastewater flows from parts of the city to the Mangere Wastewater Treatment Plant. The new interceptor will be Auckland's largest wastewater project in history, costing approximately $1.2B, and being 13 km long (plus side branches), and 4.5m diameter. It is to run from Western Springs to Mangere. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • The Central Interceptor is an upcoming Watercare Services infrastructure project to bore a giant wastewater pipe underneath the Auckland Central Isthmus, to carry wastewater flows from parts of the city to the Mangere Wastewater Treatment Plant. Apart from being intended to allow for population growth in Auckland and the resulting increased wastewater demands, it also is aiming to reduce the amount of wastewater overflows from the older combined wastewater/stormwater systems in western Auckland, which currently, on strong rainfall days, are forced to dump excess water (contaminated by faeces) into the Waitematā Harbour. The new capacity is expected to reduce these overflows by at least 80%, reducing the times per year that contaminated stormwater is dumped into the harbour from 52 days a year to 10 or fewer days. Sixteen access shafts, up to 65 metres (213 ft) deep, will be constructed. The new interceptor will be Auckland's largest wastewater project in history, costing approximately $1.2B, and being 13 km long (plus side branches), and 4.5m diameter. It is to run from Western Springs to Mangere. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software