The Central Interceptor is an upcoming Watercare Services infrastructure project to bore a giant wastewater pipe underneath the Auckland Central Isthmus, to carry wastewater flows from parts of the city to the Mangere Wastewater Treatment Plant. The new interceptor will be Auckland's largest wastewater project in history, costing approximately $1.2B, and being 13 km long (plus side branches), and 4.5m diameter. It is to run from Western Springs to Mangere.
Attributes | Values |
---|
rdfs:label
| |
rdfs:comment
| - The Central Interceptor is an upcoming Watercare Services infrastructure project to bore a giant wastewater pipe underneath the Auckland Central Isthmus, to carry wastewater flows from parts of the city to the Mangere Wastewater Treatment Plant. The new interceptor will be Auckland's largest wastewater project in history, costing approximately $1.2B, and being 13 km long (plus side branches), and 4.5m diameter. It is to run from Western Springs to Mangere. (en)
|
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
has abstract
| - The Central Interceptor is an upcoming Watercare Services infrastructure project to bore a giant wastewater pipe underneath the Auckland Central Isthmus, to carry wastewater flows from parts of the city to the Mangere Wastewater Treatment Plant. Apart from being intended to allow for population growth in Auckland and the resulting increased wastewater demands, it also is aiming to reduce the amount of wastewater overflows from the older combined wastewater/stormwater systems in western Auckland, which currently, on strong rainfall days, are forced to dump excess water (contaminated by faeces) into the Waitematā Harbour. The new capacity is expected to reduce these overflows by at least 80%, reducing the times per year that contaminated stormwater is dumped into the harbour from 52 days a year to 10 or fewer days. Sixteen access shafts, up to 65 metres (213 ft) deep, will be constructed. The new interceptor will be Auckland's largest wastewater project in history, costing approximately $1.2B, and being 13 km long (plus side branches), and 4.5m diameter. It is to run from Western Springs to Mangere. (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |